Faurecia EDI

Faurecia EDI Guides For Vendors

Faurecia EDI program requires all suppliers to be EDI capable. Suppliers should have a DUNS number for North America plants they will be shipping to.

  • EU Suppliers are not mandated to use a DUNS# per EDI regulations in EU
  • Suppliers must have the ability to receive both long term and short term delivery schedules
  • Advance Ship Notices (ASN) are mandatory when shipping
  • Faurecia EDI Clearing Centre is key contact for Supplier On-boarding or questions about testing and connectivity issues
  • Always reference the Requestor’s ticket number when applicable for support
  • Faurecia has two release processes. Each process has different requirements and Supplier must know what process they are on (levelled=“LISA” or not levelled=“NO LISA”) Your planner can give you details of your requirements

EDI Finance And Manufacturing Gains

  • Plant processes will improve and reception is automated
  • 3 way match process as EDI logistics improves NRFT
  • Accounts payables processes will be more efficient
  • Supplier invoices are matched earlier

Faurecia EDI Transactions

  • DELFOR D96A, D97A
    • Outbound Long term forecast Mixed (long + firm)
    • Levelled (LISA)
    • Non-levelled (NO LISA)
  • DELJIT D96A, D97A
    • Outbound Short term forecast (manifest)
      Levelled (LISA)
  • INVOIC D96A
    • Outbound (Self-Bill)/Inbound
    • Invoice to Supplier/Invoice from Supplier
    • Can be requested separately
  • INVOICE D07A (GLOBAL)
    • Outbound Self-bill to Supplier Can be requested separately
  • DESADV D96A, D97A
    • Inbound ASN to Faurecia Levelled or Non-levelled

Faurecia Release Options

  • LEVELLED RELEASES (the normal standard)
    • LISA releases both a DELFOR and DELJIT message (2 separate EDI messages)
      − Supplier must ship according to DELJIT (manifest) in LISA
      − DELFOR contains only long term forecast
      − Does not provide cumulative figures, or last receipts
      − Manifest can be integrated into Supplier’s ERP system
      − ASN must be sent according to Manifest (DELJIT)
  •  NON-LEVELLED RELEASES
    • Also known as “NO LISA” process or not levelled releases
    • Only a DELFOR is sent to the supplier which can have both long and short term planning
    • ASN is still required for NO LISA flows
    • No DELJIT/Manifest is sent to Supplier via EDI

To learn more about EDI and become a certified  EDI Professional please visit our course schedule page.

Leave a Reply

Your email address will not be published.

Post Navigation