EDI Procedure Test

EDI Procedure Test To Productive Use (Daimler AG EDI Processing) EDI Procedure Test must be completed before setting up an EDI connection with any of Daimler AG plants. As soon as vendor has completed the preparations at location for setting up an EDI interface, he should make sure he has completed the below mentioned steps before setting up an EDI connection. Read More →

Invoice VDA 4906

Invoice VDA 4906 Basic Requirements Invoice VDA 4906 usage via EDI has had consistently good results – this is regarded to as a logical enhancement to conventional invoicing methods. The main objectives of the communication of Invoice VDA 4906 data by EDI are as follows: Rapid communication of invoicing data from the supplier to the recipient of the goods or services Read More →

4g-shipment-lead-image-30-1480499596

Transport Data For Shipments According to VDA 4921 (Daimler AG Partner Program) Transport Data For Shipments is an important link in the external material flow process. To ensure comprehensive process information, it is essential to include transport contractors in the electronic data interchange process. The VDA recommendations for EDI communications and documents for Transport Data For Shipments Read More →